Mumbai to face 15 per cent water cut for a month from 31 March, says BMC

A 15 per cent water cut will be implemented across Mumbai for 30 days from March 31 to fix a hole in a crucial supply tunnel, the Brihanmumbai Municipal Corporation (BMC) said on Tuesday.

Water has been leaking from the tunnel after it was recently punctured in Thane while digging a borewell, BMC said in a release.

According to the civic body, its Bhandup water complex, which takes care of 65 per cent of the total water supplied to Mumbai, receives about 75 per cent of its supply through this 15-km-long tunnel that has a diameter of 5,500 mm.

“This tunnel got punctured in Thane due to digging of a borewell and water is leaking on a large scale. It is necessary to isolate the tunnel completely for repairs and use an alternate transmission system for bringing water to Bhandup, during repairs period,” said the BMC release.

The corporation said that the water supply to Mumbai and its suburbs will get affected during the switching over of transmission systems and repairs. Therefore, it has decided to impose a water cut of up to 15 per cent, said the civic body.

The BMC also appealed to citizens to use water judiciously and co-operate with it.

This story has been published from a wire agency feed without modifications to the text.

Catch all the Business News, Market News, Breaking News Events and Latest News Updates on Live Mint.
Download The Mint News App to get Daily Market Updates.

More
Less

For all the latest world News Click Here 

Read original article here

Denial of responsibility! TechAI is an automatic aggregator around the global media. All the content are available free on Internet. We have just arranged it in one platform for educational purpose only. In each content, the hyperlink to the primary source is specified. All trademarks belong to their rightful owners, all materials to their authors. If you are the owner of the content and do not want us to publish your materials on our website, please contact us by email – [email protected]. The content will be deleted within 24 hours.